Concrete Curing, Explained

Curing is not drying. It is the opposite: keeping the concrete wet and warm enough that the cement can keep reacting. A well-cured slab is stronger, tighter and longer-lasting than the same mix left to dry on its own.

Concrete Curing, Explained

What is happening inside

Cement and water react in a process called hydration. The reaction builds strength quickly in the first days and keeps going for weeks, as long as there is water and warmth.

How long to cure

Most specifications call for at least seven days, and many warm-weather jobs cure longer. Strength at seven days is typically around 70 percent of the 28-day strength, which is why many projects wait to put heavy loads on a slab.

Common methods

The method depends on the surface and the weather.

  • Curing compound sprayed on right after finishing, the most common method for slabs
  • Wet burlap or fogging, best for hot weather and vertical surfaces
  • Plastic sheeting held down at the edges
  • Insulated blankets in cold weather, sometimes with heaters

Temperature changes everything

Cold slows the reaction and heat speeds it. The Cure Clock tool uses a standard maturity method to estimate strength from time and temperature, so you can see what a cold week does to a schedule.

Common mistakes

Letting the surface dry in the first hours causes crazing and weak, dusty surfaces. Spraying water on a surface that is already set can cause color changes. Applying a curing compound over standing bleed water traps it and weakens the surface.

Next step

Questions about your project?

Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.

Get a free bid(800) 290-5816

Free bid

Tell us what you are pouring

Send the city, the kind of concrete work and when you need it. You get a plain written bid with quantities, scope and schedule, and a person answers the phone at (800) 290-5816.

  • The city or address, and the kind of work: a slab, a floor, a dock, a lot, a repair, a coating
  • The rough size and thickness if you know them, and any drawings you can send
  • Your schedule: start date, hours the building is open and anything that cannot be shut down
(800) 290-5816

Get a free bid

We only use your details to answer your request and prepare your bid.