Bollards and Wheel Stops for commercial projects
Bollards stop vehicles at doors, gas meters and equipment, and wheel stops keep cars from rolling into buildings. Set properly in concrete, they take the hit instead of the structure.

Typical bollards and Wheel Stops jobs
- Steel pipe bollards at storefronts and dock doors
- Gas meter, electrical and generator protection
- Concrete wheel stops and parking curbs
- Decorative and removable bollards
The numbers
- Typical bollard4 to 8 in steel pipe, 3 to 4 ft above grade
- Footing depthAbout 3 to 4 ft below grade
- Fill4,000 psi concrete, crowned at the top
The bollards and Wheel Stops process, step by step
- 1
Locations laid out and underground utilities located
- 2
Holes drilled and the footing sized to the bollard and expected impact
- 3
Steel pipe set plumb, filled with concrete and capped
- 4
Surface crowned to shed water, wheel stops anchored with rebar
Bollards and Wheel Stops in your city
Pick your city for the frost depth, ground and pour season that shape the work there.
Or browse every city
Nashville and Davidson County
Williamson and Maury Counties
Rutherford, Wilson and Sumner Counties
Middle and East Tennessee
The Southeast
Northeast and Mid-Atlantic
The Midwest
Texas and Oklahoma
Often ordered with this
Floors, Docks and FlatworkWarehouse and Industrial FloorsFlat, tough floors for forklifts, racks and constant traffic
Floors, Docks and FlatworkDistribution Center FloorsGiant floors placed fast with laser screeds
Floors, Docks and FlatworkCold Storage FloorsFloors that stay solid in freezers and coolers
Floors, Docks and FlatworkPolished ConcreteA hard, glossy floor made from the slab itself
Floors, Docks and FlatworkFloor Grinding and LevelingFlat floors from ones that are not
Floors, Docks and FlatworkLoading Docks and ApronsDock pads that take the beating of trucks and trailersNo service matches that search. Try a shorter word.
Bollards and Wheel Stops: straight answers
How deep should a bollard go?
Usually about as deep above grade as below, three to four feet each way, and deeper for high-impact locations. The design depends on the expected vehicle.
Do bollards need to be removable?
Where a fire lane or service access must be opened, sleeves allow removable bollards to be lifted out and locked back.
Why are there joints in my slab?
Concrete shrinks as it dries, so it cracks. Joints are planned lines where it can crack neatly, and sawing them early keeps cracks out of the middle of the panels.
Do you do bollards and Wheel Stops in my city?
Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.
Get a bid for bollards and Wheel Stops
Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.