Concrete Parking Lots for commercial projects
Concrete parking lots last decades, stay cool, resist rutting and hold up under heavy trucks. They need thick slabs, good drainage and jointing planned around the stalls.

Typical concrete Parking Lots jobs
- Retail, office and hospital parking
- Truck and fleet yards
- Parking lots for apartments, hotels and churches
- Pavement overlays and partial-depth repairs
The numbers
- Thickness5 to 6 in for cars, 7 to 8 in for trucks
- Mix4,000 psi, air-entrained for freeze-thaw
- Open to trafficOften 7 days, sooner with rapid-set or high-early mixes
The concrete Parking Lots process, step by step
- 1
Subgrade proof-rolled and base compacted, grades set to drain
- 2
Forms, dowels and tie bars placed and joints laid out
- 3
Concrete placed with a paver or by hand, textured and cured
- 4
Joints sawn and sealed, then striped and opened to traffic when strong enough
Concrete Parking Lots in your city
Pick your city for the frost depth, ground and pour season that shape the work there.
Or browse every city
Nashville and Davidson County
Williamson and Maury Counties
Rutherford, Wilson and Sumner Counties
Middle and East Tennessee
The Southeast
Northeast and Mid-Atlantic
The Midwest
Texas and Oklahoma
Often ordered with this
Floors, Docks and FlatworkWarehouse and Industrial FloorsFlat, tough floors for forklifts, racks and constant traffic
Floors, Docks and FlatworkDistribution Center FloorsGiant floors placed fast with laser screeds
Floors, Docks and FlatworkCold Storage FloorsFloors that stay solid in freezers and coolers
Floors, Docks and FlatworkPolished ConcreteA hard, glossy floor made from the slab itself
Floors, Docks and FlatworkFloor Grinding and LevelingFlat floors from ones that are not
Floors, Docks and FlatworkLoading Docks and ApronsDock pads that take the beating of trucks and trailersNo service matches that search. Try a shorter word.
Concrete Parking Lots: straight answers
Concrete or asphalt for a parking lot?
Concrete costs more up front but lasts much longer, needs less maintenance and resists heat and heavy loads, so lifetime cost is often lower.
How long before cars can park on a new lot?
Typically seven days in warm weather, or a few days if a high-early mix is used. Heavy trucks wait for the full design strength.
Why are there joints in my slab?
Concrete shrinks as it dries, so it cracks. Joints are planned lines where it can crack neatly, and sawing them early keeps cracks out of the middle of the panels.
Do you do concrete Parking Lots in my city?
Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.
Get a bid for concrete Parking Lots
Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.