Post-Tensioned Slabs for commercial projects
Post-tensioned slabs use stressed steel cables to squeeze the concrete, so they can be thinner, span farther and crack less. The work needs careful layout, stressing and records.

Typical post-Tensioned Slabs jobs
- Parking decks and podium slabs
- Slabs on grade over expansive soil
- Flat-plate floors with long spans
- Slab repairs that need to avoid cutting tendons
The numbers
- Stressing strengthCommonly about 2,500 to 3,000 psi, often at 3 to 7 days
- Tendon spacingOften 2 to 4 ft in banded layouts
- RecordsElongations checked against the drawings
The post-Tensioned Slabs process, step by step
- 1
Tendons laid and chaired on the shop drawings, anchors and ducts checked
- 2
Concrete placed and cured to the specified stressing strength
- 3
Tendons stressed with jacks and elongations recorded
- 4
Tails cut and anchors grouted or capped, and the slab sealed
Post-Tensioned Slabs in your city
Pick your city for the frost depth, ground and pour season that shape the work there.
Or browse every city
Nashville and Davidson County
Williamson and Maury Counties
Rutherford, Wilson and Sumner Counties
Middle and East Tennessee
The Southeast
Northeast and Mid-Atlantic
The Midwest
Texas and Oklahoma
Often ordered with this
Structure and FoundationsFoundation Walls and FootingsFootings and walls that carry the whole building
Structure and FoundationsDrilled Piers and CaissonsDeep shafts that carry loads to rock or firm soil
Structure and FoundationsSlab on GradeThe floor slab that everything else sits on
Structure and FoundationsElevated Slabs and DecksStructural floors poured above ground
Structure and FoundationsConcrete Columns and BeamsCast-in-place frames that stand up to the load
Structure and FoundationsShear Walls and Core WallsWalls that brace tall buildings against wind and quakesNo service matches that search. Try a shorter word.
Post-Tensioned Slabs: straight answers
Why scan a post-tensioned slab before cutting or coring?
A cut tendon can release enormous energy and weaken the slab. Ground-penetrating radar or X-ray finds the cables first, so holes go between them.
Is post-tensioning worth it?
For long spans and thin floors it saves concrete, height and often time. Short, simple slabs may be cheaper with regular rebar.
How do you keep structural pours on schedule?
A written pour plan covers truck spacing, pump placement, crew size, testing and a backup for rain or a breakdown, and the plan is agreed with the general contractor before the day.
Do you do post-Tensioned Slabs in my city?
Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.
Get a bid for post-Tensioned Slabs
Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.