Skip to content
(800) 290-5816
Floors, Docks and Flatwork

Cold Storage Floors for commercial projects

A freezer floor has to resist frost heave, thermal shock and wet, forklift-heavy use. We build it with insulation and underfloor protection so the soil under the slab never freezes.

Cold Storage Floors work by Commercial Crete
What it covers

Typical cold Storage Floors jobs

  • Freezer and cooler warehouses
  • Food processing and blast-freezing rooms
  • Pharmaceutical and floral cold rooms
  • Dock-side vestibules and transition slabs

The numbers

  • InsulationRigid foam often 4 to 8 in thick, sized to the room
  • Frost protectionUnder-slab heat or air ducts for freezers
  • SurfaceDensified, sealed or coated for washdown
How we do it

The cold Storage Floors process, step by step

  1. 1

    Base, vapor barrier and rigid insulation laid under the slab

  2. 2

    Under-slab heating or ventilated ducts installed where frost protection is required

  3. 3

    Reinforced slab placed with joint plans for low temperatures

  4. 4

    Hardened, sealed or coated for sanitation and traction

Where we pour

Cold Storage Floors in your city

Pick your city for the frost depth, ground and pour season that shape the work there.

Open the city page
Or browse every city
Questions

Cold Storage Floors: straight answers

Why can a freezer floor heave?

Cold travels down through the slab into the soil, which freezes and swells. Without insulation and under-slab heat the swelling can lift and crack the floor.

Can an existing freezer floor be repaired?

Often, with joint repair and surface systems, but heave or insulation failure needs a design review.

Why are there joints in my slab?

Concrete shrinks as it dries, so it cracks. Joints are planned lines where it can crack neatly, and sawing them early keeps cracks out of the middle of the panels.

Do you do cold Storage Floors in my city?

Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.

Next step

Get a bid for cold Storage Floors

Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.

Get a free bid(800) 290-5816

Free bid

Tell us what you are pouring

Send the city, the kind of concrete work and when you need it. You get a plain written bid with quantities, scope and schedule, and a person answers the phone at (800) 290-5816.

  • The city or address, and the kind of work: a slab, a floor, a dock, a lot, a repair, a coating
  • The rough size and thickness if you know them, and any drawings you can send
  • Your schedule: start date, hours the building is open and anything that cannot be shut down
(800) 290-5816

Get a free bid

We only use your details to answer your request and prepare your bid.