Equipment Pads for commercial projects
Equipment needs a level, solid base that carries its weight and its vibration. We pour housekeeping pads for rooftop and ground equipment with the anchor bolts set in the right place.

Typical equipment Pads jobs
- HVAC chiller, condenser and cooling tower pads
- Generator and transformer pads
- Machine foundations with vibration isolation
- Housekeeping pads for tanks and process equipment
The numbers
- Thickness6 to 12 in or more for heavy equipment
- Anchor boltsHeld in a template to within 1/8 in
- Mix4,000 psi, often with fibers
The equipment Pads process, step by step
- 1
Pad size and weights confirmed from the equipment submittal
- 2
Base compacted, rebar placed, anchor bolt templates set
- 3
Concrete placed and finished level with a broom or steel-trowel finish
- 4
Cured, bolts checked and the pad handed over to the equipment crew
Equipment Pads in your city
Pick your city for the frost depth, ground and pour season that shape the work there.
Or browse every city
Nashville and Davidson County
Williamson and Maury Counties
Rutherford, Wilson and Sumner Counties
Middle and East Tennessee
The Southeast
Northeast and Mid-Atlantic
The Midwest
Texas and Oklahoma
Often ordered with this
Floors, Docks and FlatworkWarehouse and Industrial FloorsFlat, tough floors for forklifts, racks and constant traffic
Floors, Docks and FlatworkDistribution Center FloorsGiant floors placed fast with laser screeds
Floors, Docks and FlatworkCold Storage FloorsFloors that stay solid in freezers and coolers
Floors, Docks and FlatworkPolished ConcreteA hard, glossy floor made from the slab itself
Floors, Docks and FlatworkFloor Grinding and LevelingFlat floors from ones that are not
Floors, Docks and FlatworkLoading Docks and ApronsDock pads that take the beating of trucks and trailersNo service matches that search. Try a shorter word.
Equipment Pads: straight answers
Why should a pad be bigger than the equipment?
A margin around the base keeps the equipment stable and gives room for service and drainage, and a wider pad spreads weight onto the soil.
Can a pad be poured over existing pavement?
It can be doweled into sound concrete, but weak or cracked pavement is removed first so the pad does not settle.
How flat does a floor need to be?
It depends on the traffic. Standard retail floors tolerate a little roll, while narrow-aisle forklifts and automated vehicles need very flat, level floors, measured with FF and FL numbers.
Do you do equipment Pads in my city?
Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.
Get a bid for equipment Pads
Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.