Hydrodemolition for commercial projects
Hydrodemolition uses a robot with a very high-pressure water jet to remove deteriorated concrete while leaving sound concrete and rebar intact, without micro-cracks.

Typical hydrodemolition jobs
- Bridge, deck and parking structure repair
- Removal around corroded rebar
- Surface scarification before overlays
- Selective removal near live equipment
The numbers
- PressureAbout 15,000 to 40,000 psi
- ResultNo micro-cracking, rebar left clean
- WaterCollected and treated before discharge
The hydrodemolition process, step by step
- 1
Area surveyed and the removal depth set from the plan
- 2
Robot sets up and the jet is programmed to depth
- 3
Deteriorated concrete is blasted away and vacuumed up
- 4
Wash water collected and treated, surface inspected and repaired
Hydrodemolition in your city
Pick your city for the frost depth, ground and pour season that shape the work there.
Or browse every city
Nashville and Davidson County
Williamson and Maury Counties
Rutherford, Wilson and Sumner Counties
Middle and East Tennessee
The Southeast
Northeast and Mid-Atlantic
The Midwest
Texas and Oklahoma
Often ordered with this
Cutting, Demolition and SpecialtyConcrete DemolitionOld concrete broken out, hauled off and recycled
Cutting, Demolition and SpecialtyConcrete Sawing and CuttingClean straight cuts in slabs, walls and pavement
Cutting, Demolition and SpecialtyCore DrillingRound, clean holes through slabs and walls
Cutting, Demolition and SpecialtyWall Sawing and Slab RemovalOpenings and slabs cut out in controlled pieces
Cutting, Demolition and SpecialtyConcrete Pumping and PlacementConcrete delivered exactly where you need it
Cutting, Demolition and SpecialtyCold Weather ConcreteWinter pours that still reach full strengthNo service matches that search. Try a shorter word.
Hydrodemolition: straight answers
Why choose hydrodemolition?
It removes only the weak concrete, leaves the rebar clean and does not shake the structure, so it is the best choice when the steel must stay in place.
Is it expensive?
The setup costs more than a breaker, but it is fast on large areas and leaves a better bond surface, which cuts repair time and later failures.
How do weather and curing change a pour?
Heat and cold change how fast concrete sets and gains strength. A weather plan sets mix, protection and timing so the slab reaches its strength safely.
Do you do hydrodemolition in my city?
Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.
Get a bid for hydrodemolition
Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.