Hot Weather Concrete for commercial projects

Heat speeds up setting and dries the surface before the slab is ready, which causes plastic cracking and weak surfaces. A hot-weather plan keeps the concrete cool and the surface wet.

Hot Weather Concrete work by Commercial Crete
What it covers

Typical hot Weather Concrete jobs

  • Summer slabs, paving and flatwork
  • Pours on windy, dry or hot afternoons
  • Early-morning and night pours
  • Evaporation control with fog, shades and retarders

The numbers

  • Hot weatherAir above about 90 F, or windy and dry
  • Concrete temperatureHeld at or below about 95 F
  • Evaporation rateAbove about 0.2 lb per sq ft per hour is a cracking risk
How we do it

The hot Weather Concrete process, step by step

  1. 1

    Forecast, wind and humidity checked and the pour moved to the cool hours

  2. 2

    Mix ordered with ice, retarder and a limit on temperature

  3. 3

    Subgrade and forms dampened and shade or windbreaks set

  4. 4

    Fog or evaporation retarder applied and curing started immediately

Where we pour

Hot Weather Concrete in your city

Pick your city for the frost depth, ground and pour season that shape the work there.

Open the city page
Or browse every city
Questions

Hot Weather Concrete: straight answers

Why does hot weather crack slabs?

The surface dries faster than the concrete below can bleed water up, so it shrinks and cracks while still plastic. Cooling and covering the surface prevents it.

Do you pour at night in summer?

Often, when it is hot. Night pours keep the mix cool, give more working time and reduce evaporation.

Is cutting and coring safe for the structure?

Yes, when it is planned. We scan for rebar, utilities and post-tension cables first and have the engineer review openings in structural members.

Do you do hot Weather Concrete in my city?

Most likely. Commercial Crete serves cities across the country, and every city has its own page. Use the map, pick your city below or call (800) 290-5816 and tell us where the project is.

Next step

Get a bid for hot Weather Concrete

Tell us about the project: the city, the kind of concrete work and when you need it. You get a plain written bid, and a person answers the phone at (800) 290-5816.

Get a free bid(800) 290-5816

Free bid

Tell us what you are pouring

Send the city, the kind of concrete work and when you need it. You get a plain written bid with quantities, scope and schedule, and a person answers the phone at (800) 290-5816.

  • The city or address, and the kind of work: a slab, a floor, a dock, a lot, a repair, a coating
  • The rough size and thickness if you know them, and any drawings you can send
  • Your schedule: start date, hours the building is open and anything that cannot be shut down